24V Load Budget: Why Can a 150W Supply Pass a Steady Load Test but Dip at Machine Startup?

QUICK LINKS

Phihong BI150-240A-R power supply beside a test instrument illustrating a startup voltage dip

A machine can draw an acceptable current once it is running and still reset its controller when it starts. Startup combines loads on a timeline. A controller, an I/O branch and another module may all draw extra current in the same interval even though their steady-state total is modest. The first useful question is whether the dip starts at the power supply or develops along the path to the device.

Quick answer. Capture supply output, voltage at the resetting load and rail current on the same timeline. Compare the dip with the load’s minimum voltage and time requirements. Use the BI150-240A-R datasheet for the specific test conditions behind its ratings and transient response.

Why This Topic Matters Now

Retrofit work often combines changes that land in different engineering records. The replacement power supply appears in the BOM. New branch wiring may be covered by a harness revision. A change in the sequence that energizes sensors and valves may be recorded only in firmware. A one-number load budget cannot show which of those changes causes a fault.

Create a startup event list with the machine team. Include the operator action or input restoration, initial controller boot, the first downstream load enable and any retry that follows. Then gather enough signals to place each event on the same time axis.

For the wider decision, start with the complete retrofit qualification process. Then connect this result with harness and connector fit review. The earlier industrial retrofit guide provides the broader engineering background.

Industrial retrofit: three connected decisions
  1. Define the machineLoad, cabinet and installation requirements
  2. Evaluate the retrofitFit, startup, temperature and EMC
  3. Release the configurationApproved supply, harness and service record

Conceptual qualification workflow. Each result belongs to the exact tested configuration.

Which loads are active at the same instant?

Break the rail into branches and record steady current, startup behavior and the trigger for each transition. Where a load’s current is specified at a lower internal rail, measure at its 24V input or account for conversion losses before combining it with other branches. A charge-up pulse can dominate for a brief interval even if the branch draws little after startup.

Mode Evidence
Control boot Current profile and time to controller ready
Output enable Load overlap and branch voltage when I/O becomes active
Warm restart Remaining stored energy and firmware path after a short interruption
Optional equipment Additional branches or different startup behavior

An illustrative machine might draw 3.4A in ordinary operation and 5.8A during a measured startup interval. Those totals describe separate conditions. Neither establishes that a particular controller stays above its input requirement, and neither automatically justifies a supply selection. Keep duration, load-side voltage and observed machine behavior with the total.

How do you tell a source dip from distribution loss?

Compare the voltage at the supply terminals with the voltage at the load over the same interval. If source voltage remains within the accepted range but device input falls, inspect the distribution path and return. If both voltages fall together, investigate source response and the input event under qualified test conditions. A partial overlap can indicate a combination of source response and harness loss.

What the traces show What to investigate next
Stable PSU output, local device dip Harness length, branch protection, terminal connections and return path
Both rails sag as current rises Load overlap, source dynamic response and input stability
Rails stable but controller resets Downstream regulator, reset circuitry, watchdog and firmware event
One condition fails after warmup Temperature, repeat duty or sequence differences

Measure current without introducing an artificial restriction into the circuit. Use the approved equipment and procedure for any mains-side work. Document probe placement and acquisition settings. Without that information, a waveform screenshot may be impossible for another team to reproduce.

Can a setpoint adjustment solve the problem?

A higher setpoint can raise voltage at a distant load, but it changes the entire rail. Check load maximum input limits and output power along with the minimum voltage at the far end. Phihong’s BI150-240A-R documentation calls for current derating above 24V to stay within rated output power. Treat adjustment as one controlled option alongside a wiring change, sequencing change or a different supply.

If the issue is a short peak, moving one branch enable later can reduce overlap. That change also affects machine readiness and fault handling. Retest the normal operating cycle, cold and warm starts and recovery after an interruption. Sequence changes should have a defined owner and a firmware revision tied to the release evidence.

What should pass or fail in the startup test?

Set limits before comparing supplies. Specify the minimum accepted device input, permissible duration below a threshold where relevant, required firmware state and whether intervention is allowed. Run repeats across the intended use conditions and capture the least favorable cases. Keep one passing and one failing example when there is a clear signature. That gives service engineers a known comparison point.

Acceptance record Include
Setup Supply, machine and harness revisions and input conditions
Result Lowest voltage, duration, current peak and time of each event
Behavior Reset, missed action, automatic recovery or manual intervention
Control Released electrical, mechanical or firmware change and its owner

Key Takeaways

Qualify the 24V system against its startup timeline and device-side limits. A clean steady-state result is useful, but the release decision depends on the worst relevant startup and recovery events. Tie the measured traces to the production configuration.

FAQs

Is a startup dip always a power supply fault?

No. Wiring, connectors, downstream regulators, a coincident load step or an upstream input disturbance can create similar symptoms.

Should I measure at the board or at the device?

Measure both when you need to distinguish source behavior from distribution loss. The device-side trace determines whether the load saw its required input.

Can the average current be below rating during a failure?

Yes. Average current can hide a short overlap or a short voltage disturbance long enough to reset sensitive equipment.

SHARE THIS ARTICLE